Tuesday morning, when I entered the back door, Brian Hall, left, was busy working on the warm air supply and cold air return housed within the chase. Brandon McMahan, right, was working in the downstairs bathroom running the insulated duct work.
Thursday morning Brian, left, and Nathan Gregory, joined the crew. The crew worked well together. Everyone had a job to do and they stayed on task. Brandon, lower left, was apart of the crew working in the basement. Jon and I have discussed the fact that the crew showed up as scheduled and did such a good job. We are thankful for their hard labor. Brian Hall, lower right, the job supervisor, checked everything out to be sure the system worked properly.