HOUGIE HEAVEN HOUSE RAISING
BOARDS ON THE BACK WALL, JULY 7-8
FOUR WEEKS
July 7, I assisted Jon with adding the boards on the first floor of the back wall. 
July 8, we put the boards on the second floor of the back wall.  Shorter boards were used to accommodate the porch roof.  July 9, Jon added the short boards above the second floor windows.  The red ladder we borrowed from Terry came in handy for the second floor.  
It was four weeks ago on the morning of June 10, that the house raising started.  Family and friends walked up our drive to start the project of building up from the basement foundation. 

This photo was taken from Burningtown Road with the zoom lens of our digital camera.  
HOME
Pages:  1   2   3   4   5  6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24  25   2627   28   29   30   31   32   33   34   35  36   37   38   39   40   41   42   43   44   45   46   47  48   49   50   51  52   53   54   55   56   57   58   59  60  61   62   63   64  65   66   67   68  69   70   71   72   73   74    
Homestead-The fastest Way to Build a Web Site!
e-mail me
Sign InView Entries
Houglum Fine Art