Kathy assisted Joe and Joe John with cutting and lifting the lattice to Jon and Terry, who were nailing the lattice in place.  Downstairs Linda assisted Frank with cutting tails for the rafters and the fascia boards.  The photo on the right is the Southeast corner with the rafters. 
Frank took Terry's place on the roof with Jon, when Terry left at 6:30.  Joe John, Kathy, Jon and Joe had carried the 18 feet metal roofing to the saw horses and stacked them earlier in the morning.   After supper, the crew went back to work to finish the job.  Joe John, Kathy and Linda were on the ground to clip the metal to vicegrips that were attached to a rope.  Jon and Frank pulled the metal up on the skid to the top.  Joe was inside pulling on the rope to help. 
The last piece of metal went on at 9:45 PM, Saturday evening.  A light on the ground helped Jon and Frank find their way down the ladder.   Page 15 shows photos taken on Sunday of the finished job.  The roofing crew:  Linda, Joe, Kathy, Jon, Joe John, Frank, and the missing person, Terry.  Gail and Susie assisted Carolyn in the kitchen.
HOME
Pages:  1   2   3   4   5  6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24  25   2627   28   29   30   31   32   33   34   35  36   37   38   39   40   41   42   43   44   45   46   47  48   49   50   51  52   53   54   55   56   57   58   59  60  61   62   63   64  65   66   67   68  69   70   71   72   73   74   
HOUGIE HEAVEN HOUSE RAISING
THE METAL ROOFING, JUNE, 16, DAY SEVEN
Houglum Fine Art
Homestead-The fastest Way to Build a Web Site!
e-mail me
Sign InView Entries